TY - GEN
T1 - Situational analysis of the production of electric energy and its association with the energy overcapacity in the Peruvian electric market
AU - Meza Zamata, Jessica Rosario
AU - Rojas Salazar, Arcelia Olga
AU - Ingar, Katia Vigo
AU - Garcia Perez, Mario Alberto
AU - Damas Flores, Marcelo Carlos
AU - Alarcon Cueva, Niko Alain
AU - Chavez Gallegos, Eduardo Nelson
N1 - Publisher Copyright:
© 2024 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2024
Y1 - 2024
N2 - In Peru, the energy market is continually affected by the different policies in this sector, the health crisis and the continuous social upheavals that are factors that drive an energy oversupply. The objective of this research is to carry out a study of the Peruvian electricity market to understand the factors that are related to the oversupply of energy generation in the Peruvian electricity market. To do this, the Peruvian electricity market, its characteristics, supply and demand for electricity generation are studied. In addition, the current legal framework is described in order to facilitate understanding of the operation of the corresponding activities. It is concluded that a decreasing spot price and an oversupply of generation make the entry of new base generators unattractive.
AB - In Peru, the energy market is continually affected by the different policies in this sector, the health crisis and the continuous social upheavals that are factors that drive an energy oversupply. The objective of this research is to carry out a study of the Peruvian electricity market to understand the factors that are related to the oversupply of energy generation in the Peruvian electricity market. To do this, the Peruvian electricity market, its characteristics, supply and demand for electricity generation are studied. In addition, the current legal framework is described in order to facilitate understanding of the operation of the corresponding activities. It is concluded that a decreasing spot price and an oversupply of generation make the entry of new base generators unattractive.
KW - Electricity market
KW - electrical demand
KW - energy oversupply
KW - investment
UR - https://www.scopus.com/pages/publications/85217247348
U2 - 10.18687/LEIRD2024.1.1.838
DO - 10.18687/LEIRD2024.1.1.838
M3 - Conference contribution
AN - SCOPUS:85217247348
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 4th LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development
A2 - Larrondo Petrie, Maria M.
A2 - Texier, Jose
A2 - Matta, Rodolfo Andres Rivas
PB - Latin American and Caribbean Consortium of Engineering Institutions
T2 - 4th LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development, LEIRD 2024
Y2 - 2 December 2024 through 4 December 2024
ER -