TY - GEN
T1 - Reuse of solid organic waste to produce biogas and compost as a circular economy process in an underground mining unit
AU - Hernani, Daniela
AU - César Rodriguez, Julio
AU - Guzman, Maribel
N1 - Publisher Copyright:
© 2024 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2024
Y1 - 2024
N2 - The main objective of the project is to carry out a cost-benefit analysis for the use of organic solid waste generated in a specific mining unit. Likewise, the main parameters that influence the treatment of organic waste to obtain biogas and compost are determined. The proposal evaluates an underground mining operation that generates around 1.35 tons of organic solid waste per day. The process of obtaining biogas requires the evaluation of various factors such as the composition of the waste, temperature, pH of the process, among others. The cost-benefit analysis of the project to implement a biogas plant analyzed is feasible, since two proposals can be implemented. The first one requires a total investment of 54,738 soles, generating an annual profitability of 5,192 soles. The investment recovery time being 10.3 years. A second proposal requires a total investment of 41,738 soles, generating an annual return of 4,914 soles with an investment recovery time of 8.5 years. The first proposal provides a biosol (fertilizer) production of 57.30 m3 and 0.42 tons of biosol (compost); On the other hand, for the Second proposal it determines that a production of 57.30 m3 of biol and 0.01 tons of biosol will be obtained.
AB - The main objective of the project is to carry out a cost-benefit analysis for the use of organic solid waste generated in a specific mining unit. Likewise, the main parameters that influence the treatment of organic waste to obtain biogas and compost are determined. The proposal evaluates an underground mining operation that generates around 1.35 tons of organic solid waste per day. The process of obtaining biogas requires the evaluation of various factors such as the composition of the waste, temperature, pH of the process, among others. The cost-benefit analysis of the project to implement a biogas plant analyzed is feasible, since two proposals can be implemented. The first one requires a total investment of 54,738 soles, generating an annual profitability of 5,192 soles. The investment recovery time being 10.3 years. A second proposal requires a total investment of 41,738 soles, generating an annual return of 4,914 soles with an investment recovery time of 8.5 years. The first proposal provides a biosol (fertilizer) production of 57.30 m3 and 0.42 tons of biosol (compost); On the other hand, for the Second proposal it determines that a production of 57.30 m3 of biol and 0.01 tons of biosol will be obtained.
KW - biogas
KW - biosol
KW - compost
KW - organic waste
KW - recycling
KW - solid waste
UR - http://www.scopus.com/inward/record.url?scp=85203829003&partnerID=8YFLogxK
U2 - 10.18687/LACCEI2024.1.1.442
DO - 10.18687/LACCEI2024.1.1.442
M3 - Conference contribution
AN - SCOPUS:85203829003
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 22nd LACCEI International Multi-Conference for Engineering, Education and Technology
PB - Latin American and Caribbean Consortium of Engineering Institutions
T2 - 22nd LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2024
Y2 - 17 July 2024 through 19 July 2024
ER -