TY - JOUR
T1 - Reliability, availability and maintainability study for failure analysis in series capacitor bank
AU - Arias Velásquez, Ricardo Manuel
AU - Mejía Lara, Jennifer Vanessa
N1 - Publisher Copyright:
© 2018 Elsevier Ltd
PY - 2018/4
Y1 - 2018/4
N2 - In this research, the objective is introducing the fundamentals of reliability analysis, it has been applied to the planning and design of Series Capacitor (SC) Bank, applied for power lines. It considers the cost of power outages, the decision process for new and existing power equipment in several systems, as well as the ability to make quantitative analysis “Cost – Vs. - Reliability” trade-off studies. The lack of credible data concerning equipment reliability and the cost of power outages has hindered engineers in making such studies. The study case considers a Reliability, Availability, and Maintainability (RAM) calculations, it has been performed for the series capacitor banks to be located at Cotaruse 220 kV, 4500 m over sea level (mosl) in a substation, located in Peru. The calculations are divided into forced and scheduled outages. A crew delay (for example: travel time) of 2 h, as well as 1 h for switching, have been included in calculations. The results are divided into forced and scheduled outages with a reliability calculation and spare parts are listed in this research.
AB - In this research, the objective is introducing the fundamentals of reliability analysis, it has been applied to the planning and design of Series Capacitor (SC) Bank, applied for power lines. It considers the cost of power outages, the decision process for new and existing power equipment in several systems, as well as the ability to make quantitative analysis “Cost – Vs. - Reliability” trade-off studies. The lack of credible data concerning equipment reliability and the cost of power outages has hindered engineers in making such studies. The study case considers a Reliability, Availability, and Maintainability (RAM) calculations, it has been performed for the series capacitor banks to be located at Cotaruse 220 kV, 4500 m over sea level (mosl) in a substation, located in Peru. The calculations are divided into forced and scheduled outages. A crew delay (for example: travel time) of 2 h, as well as 1 h for switching, have been included in calculations. The results are divided into forced and scheduled outages with a reliability calculation and spare parts are listed in this research.
KW - Asset management
KW - Availability
KW - Maintainability
KW - Overhead lines
KW - Series capacitor
UR - https://www.scopus.com/pages/publications/85041461524
U2 - 10.1016/j.engfailanal.2018.01.008
DO - 10.1016/j.engfailanal.2018.01.008
M3 - Article
AN - SCOPUS:85041461524
SN - 1350-6307
VL - 86
SP - 158
EP - 167
JO - Engineering Failure Analysis
JF - Engineering Failure Analysis
ER -