T1 - Proposal to expand the pumping system for treatment and recirculation of underground water in a mining operation
AU - Sumaria, Guisell
AU - Suarez, Christopher
AU - Guzman, Maribel
N1 - Publisher Copyright:
© 2024 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2024
Y1 - 2024
N2 - This work presents a proposal for the expansion of a water treatment system inside an underground mine, and thus optimize the water resource present in the mining operation. For this purpose, the design parameters of an existing two-stage pumping system were determined and the hydrogeological conditions of the mine were analyzed. It was determined that a 500 HP pump was necessary that can deliver a dynamic head of 75 meters. Finally, an evaluation of the economic feasibility of the expansion design towards a three-stage pumping system with sedimentary pumps was carried out for its implementation. An approximate CAPEX of the pumping system of US$ 13,571,442 was determined; and an OPEX of 0.299 US$/m3. Likewise, based on the estimated VPT of the mineral, the reserve report, the CAPEX of the pumping system and other projects, a NPV of the mine of US$ 65,562,057 and an IRR of 18.10% was estimated.
AB - This work presents a proposal for the expansion of a water treatment system inside an underground mine, and thus optimize the water resource present in the mining operation. For this purpose, the design parameters of an existing two-stage pumping system were determined and the hydrogeological conditions of the mine were analyzed. It was determined that a 500 HP pump was necessary that can deliver a dynamic head of 75 meters. Finally, an evaluation of the economic feasibility of the expansion design towards a three-stage pumping system with sedimentary pumps was carried out for its implementation. An approximate CAPEX of the pumping system of US$ 13,571,442 was determined; and an OPEX of 0.299 US$/m3. Likewise, based on the estimated VPT of the mineral, the reserve report, the CAPEX of the pumping system and other projects, a NPV of the mine of US$ 65,562,057 and an IRR of 18.10% was estimated.
KW - mining operation
KW - Pumping system
KW - underground mining
KW - water recirculation
KW - water treatment
UR - http://www.scopus.com/inward/record.url?scp=85203819019&partnerID=8YFLogxK
U2 - 10.18687/LACCEI2024.1.1.215
DO - 10.18687/LACCEI2024.1.1.215
M3 - Conference contribution
AN - SCOPUS:85203819019
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 22nd LACCEI International Multi-Conference for Engineering, Education and Technology
PB - Latin American and Caribbean Consortium of Engineering Institutions
T2 - 22nd LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2024
Y2 - 17 July 2024 through 19 July 2024
ER -