TY - GEN
T1 - Optimizing the Resource’s Mobility, Transportation, and Networking in the Project Construction Industry, Using a Fractal Method
AU - Cheraghi, Esmaeil
AU - Zohrehvandi, Shakib
AU - Knapčíková, Lucia
AU - Shadrokh, Shahram
AU - Soltani, Roya
AU - Khalilzadeh, Mohammad
N1 - Publisher Copyright:
© 2023, The Author(s), under exclusive license to Springer Nature Switzerland AG.
PY - 2023
Y1 - 2023
N2 - When the number of projects in a company increases, it becomes very important to choose the right strategy to supply resources and raw materials in profit and loss and finish the work according to the schedule. This study presents a new mathematical model using the fractal method to optimize the resource planning system in project-oriented construction and industrial companies, and the results are analyzed. This article aims to introduce a fractal resource requirement planning (FRRP) model in project-oriented construction and industrial companies by providing a fractal framework to minimize resource costs and the smooth flow of materials between projects to meet the existing demand. Assuming three levels of headquarters, regions, and projects, each of them in the collection is a self-similar structure defined as a fractal. The study was carried out in one of the contracting companies in the industrial and construction fields, which operates as a project-oriented project in different regions of the country. The finding shows the proposed model could be used and implemented for resource management in project-oriented construction companies.
AB - When the number of projects in a company increases, it becomes very important to choose the right strategy to supply resources and raw materials in profit and loss and finish the work according to the schedule. This study presents a new mathematical model using the fractal method to optimize the resource planning system in project-oriented construction and industrial companies, and the results are analyzed. This article aims to introduce a fractal resource requirement planning (FRRP) model in project-oriented construction and industrial companies by providing a fractal framework to minimize resource costs and the smooth flow of materials between projects to meet the existing demand. Assuming three levels of headquarters, regions, and projects, each of them in the collection is a self-similar structure defined as a fractal. The study was carried out in one of the contracting companies in the industrial and construction fields, which operates as a project-oriented project in different regions of the country. The finding shows the proposed model could be used and implemented for resource management in project-oriented construction companies.
KW - Fractal resource requirement planning (FRRP)
KW - Networking
KW - Project construction industry
KW - Project resource planning
KW - Resource’s mobility
KW - Resource’s transportation
UR - http://www.scopus.com/inward/record.url?scp=85161460031&partnerID=8YFLogxK
U2 - 10.1007/978-3-031-28225-6_7
DO - 10.1007/978-3-031-28225-6_7
M3 - Conference contribution
AN - SCOPUS:85161460031
SN - 9783031282249
T3 - EAI/Springer Innovations in Communication and Computing
SP - 101
EP - 118
BT - 9th International Conference on Mobility, IoT and Smart Cities - EAI Mobility IoT 2022
A2 - Knapcikova, Lucia
A2 - Zohrehvandi, Shakib
PB - Springer Science and Business Media Deutschland GmbH
T2 - 9th International Conference on Mobility, IoT and Smart Cities, EAI Mobility IoT 2022
Y2 - 15 December 2022 through 16 December 2022
ER -