N2 - Currently, concrete poles have had a positive growth, due to the electric power and telecommunications sectors. Therefore, the present research work has as its main objective to make a proposal for improvement in the production process of a company that is dedicated to the manufacture of reinforced concrete poles. For which, an analysis and diagnosis of the current situation of the company has been carried out, which has led to selecting the most appropriate lean manufacturing tools (5S, TPM, Jidoka) for each work area within the production process. In this sense, the proposal consists of making a schedule for the implementation of lean manufacturing tools that will facilitate the elimination of waste in said processes. Finally, the proposal is complemented with an evaluation of the savings generated by the implementation of the tools.
AB - Currently, concrete poles have had a positive growth, due to the electric power and telecommunications sectors. Therefore, the present research work has as its main objective to make a proposal for improvement in the production process of a company that is dedicated to the manufacture of reinforced concrete poles. For which, an analysis and diagnosis of the current situation of the company has been carried out, which has led to selecting the most appropriate lean manufacturing tools (5S, TPM, Jidoka) for each work area within the production process. In this sense, the proposal consists of making a schedule for the implementation of lean manufacturing tools that will facilitate the elimination of waste in said processes. Finally, the proposal is complemented with an evaluation of the savings generated by the implementation of the tools.
KW - Lean manufacturing
KW - production process
KW - reinforced concrete posts
UR - http://www.scopus.com/inward/record.url?scp=85139993216&partnerID=8YFLogxK
U2 - 10.18687/LACCEI2022.1.1.524
DO - 10.18687/LACCEI2022.1.1.524
M3 - Contribución a la conferencia
AN - SCOPUS:85139993216
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - 20th LACCEI International Multi-Conference for Engineering, Education Caribbean Conference for Engineering and Technology
A2 - Larrondo Petrie, Maria M.
A2 - Texier, Jose
A2 - Pena, Andrea
A2 - Viloria, Jose Angel Sanchez
PB - Latin American and Caribbean Consortium of Engineering Institutions
T2 - 20th LACCEI International Multi-Conference for Engineering, Education Caribbean Conference for Engineering and Technology, LACCEI 2022
Y2 - 18 July 2022 through 22 July 2022
ER -