N2 - Maintenance and decommissioning real options (RO) models are developed for life-cycle cost-benefit (LCCB) analysis of offshore platforms. Uncertainties about hydrocarbon prices, maintenance costs, environmental loading, structural capacity and damage due to deterioration are taken into consideration in the RO modelling. Expressions are derived for expected costs and benefits in terms of the availability function of the platform, which depends on the hazard and restoring functions, and on the annual probability of failure of the structure. Results show that the use of the net present value (NPV) approach can significantly underestimate the LCCB. The RO formulation developed is shown to provide a proper framework to account for the value of the managerial flexibility to consider different options along the service lifetime of the structure, such as maintenance and decommissioning, and to make decisions adapting to future information.
AB - Maintenance and decommissioning real options (RO) models are developed for life-cycle cost-benefit (LCCB) analysis of offshore platforms. Uncertainties about hydrocarbon prices, maintenance costs, environmental loading, structural capacity and damage due to deterioration are taken into consideration in the RO modelling. Expressions are derived for expected costs and benefits in terms of the availability function of the platform, which depends on the hazard and restoring functions, and on the annual probability of failure of the structure. Results show that the use of the net present value (NPV) approach can significantly underestimate the LCCB. The RO formulation developed is shown to provide a proper framework to account for the value of the managerial flexibility to consider different options along the service lifetime of the structure, such as maintenance and decommissioning, and to make decisions adapting to future information.
KW - Decommissioning
KW - Life-cycle cost-benefit analysis
KW - Maintenance
KW - Net present value
KW - Offshore platforms
KW - Real options
UR - http://www.scopus.com/inward/record.url?scp=79958829103&partnerID=8YFLogxK
U2 - 10.1080/15732470902842903
DO - 10.1080/15732470902842903
M3 - Article
AN - SCOPUS:79958829103
SN - 1573-2479
VL - 7
SP - 733
EP - 745
JO - Structure and Infrastructure Engineering
JF - Structure and Infrastructure Engineering
IS - 10
ER -