TY - JOUR
T1 - Ecological Flow Regime as an instrument for environmental impact assessment in an area impacted by the mining industry
AU - Chuquihuamani, Bruno
AU - Guzman, Maribel
N1 - Publisher Copyright:
© 2025 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2025
Y1 - 2025
N2 - Mining is an extremely important industry for Peru. However, its environmental impacts can be harmful, especially if they affect bodies of water near communities. In this sense, new environmental management instruments are being implemented. In this work, the ecological flow of a river affected by mining activity will be evaluated using the Tennant-Montana method. Taking the Santa River basin as a case study, the results showed that mining does not represent an activity that represents an exhaustive demand for water in the evaluated basin.
AB - Mining is an extremely important industry for Peru. However, its environmental impacts can be harmful, especially if they affect bodies of water near communities. In this sense, new environmental management instruments are being implemented. In this work, the ecological flow of a river affected by mining activity will be evaluated using the Tennant-Montana method. Taking the Santa River basin as a case study, the results showed that mining does not represent an activity that represents an exhaustive demand for water in the evaluated basin.
KW - Ecological flow
KW - Environmental management
KW - Mining activity
KW - Santa River
KW - Tenant-Montana methodology
UR - https://www.scopus.com/pages/publications/105019295379
U2 - 10.18687/LACCEI2025.1.1.545
DO - 10.18687/LACCEI2025.1.1.545
M3 - Conference article
AN - SCOPUS:105019295379
SN - 2414-6390
JO - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
JF - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
IS - 2025
T2 - 23rd LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2025
Y2 - 16 July 2025 through 18 July 2025
ER -