AUTOMATED DATA CAPTURE AND ANALYSIS TO DETECT PROCESS WASTE IN INTERIOR FINISHING WORK

  • Ashan Senel Asmone
  • , Danny Murguia
  • , Asitha Rathnayake
  • , Campbell Middleton

Producción científica: Contribución a una revistaArtículo de la conferenciarevisión exhaustiva

1 Cita (Scopus)

Resumen

Detecting process waste in complex production systems is still a challenge in construction projects. The integration of lean construction with automated data capturing technologies presents an opportunity to timely detect process waste and steer projects towards targets. By using vision-based technology for automated progress monitoring in a residential building, this study examines interior finishing work activities through the lenses of process/location flow and operations/trade flow. Location-based management tools (flowlines and line-of-balance) were used to visualise the data. Results showed that planned production deviated from actuals in all activities. Significant variability was observed within the completion of each activity at each location. The ratio between average production rate and exemplar performance indicated a missed opportunity to improve project performance. Resultantly, several waste types were identified including inefficient work, space not being worked in, unnecessary movement of people and unnecessary transportation of materials. The ability to actively pinpoint process waste provides managers with a granular understanding of inefficiencies, enabling targeted interventions to enhance productivity and reduce waste. The findings support that automated data capturing and analytics through the lenses of lean construction is a useful strategy to inform construction programmes to be more realistic, improving upon efficiency and waste reduction.

Idioma originalInglés
Páginas (desde-hasta)660-671
Número de páginas12
PublicaciónAnnual Conference of the International Group for Lean Construction, IGLC
Volumen32
DOI
EstadoPublicada - 2024
Publicado de forma externa
Evento32nd Annual Conference of the International Group for Lean Construction, IGLC 2024 - Auckland, Nueva Zelanda