TY - JOUR
T1 - Assessing impacts of economic and municipality factors on building construction duration using ensemble categorical boosting
AU - Peiman, Farshad
AU - Khalilzadeh, Mohammad
AU - Shahsavari-Pour, Nasser
AU - Ravanshadnia, Mehdi
N1 - Publisher Copyright:
© The Author(s) 2025.
PY - 2025/6
Y1 - 2025/6
N2 - In addition to the need to increase the accuracy of models, there is a lack of consensus among researchers about considering factors of external economic in duration prediction models. First, the categorical boosting (CatBoost-2018) model in the first-level was created aiming to find the optimal combination of inputs with the best results for the duration. In continuation, only the second-level model i.e. Stacking-CatBoost2 model was created aiming to noticeably increase the estimation accuracy of two models of the first-level including the artificial neural network (ANN) single model and CatBoost1. The final stacking results also have shown the superiority of that model over three other study models according to the K-fold method (used for validation and verification). Then, the results of sensitivity analysis (SA) using the error deterioration measurement method have shown the negative impact of an economic input and the significant positive impact of a unique input to the project and three external economic factors.
AB - In addition to the need to increase the accuracy of models, there is a lack of consensus among researchers about considering factors of external economic in duration prediction models. First, the categorical boosting (CatBoost-2018) model in the first-level was created aiming to find the optimal combination of inputs with the best results for the duration. In continuation, only the second-level model i.e. Stacking-CatBoost2 model was created aiming to noticeably increase the estimation accuracy of two models of the first-level including the artificial neural network (ANN) single model and CatBoost1. The final stacking results also have shown the superiority of that model over three other study models according to the K-fold method (used for validation and verification). Then, the results of sensitivity analysis (SA) using the error deterioration measurement method have shown the negative impact of an economic input and the significant positive impact of a unique input to the project and three external economic factors.
KW - Artificial intelligence
KW - Building construction projects
KW - External economic factors
KW - Real duration estimation
KW - Stacking and categorical boosting ensemble methods
UR - https://www.scopus.com/pages/publications/105006427201
U2 - 10.1007/s42452-025-07078-y
DO - 10.1007/s42452-025-07078-y
M3 - Article
AN - SCOPUS:105006427201
SN - 3004-9261
VL - 7
JO - Discover Applied Sciences
JF - Discover Applied Sciences
IS - 6
M1 - 539
ER -