A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows

Sayyid Ali Banihashemi, Mohammad Khalilzadeh

Producción científica: Contribución a una revistaArtículorevisión exhaustiva

3 Citas (Scopus)

Resumen

Due to limited financial resources and high costs of infrastructure projects, project stakeholders seek to gain maximum profits with optimal resource utilization as well as cost and time minimization. Therefore, this study presents a multi-mode resource-constrained project scheduling model considering the uncertain parameters of cost and time together with the goals of maximizing the net present value and minimizing resource usage fluctuation. Also, the assumptions related to the real-world projects regarding multi-mode activities, limitation of renewable resources, and the deadline of project are incorporated into the proposed model. Moreover, a robust scheduling method is presented to better deal with the inherent uncertainties of projects regarding cost and time. The model is solved with the exact method named lexicographic goal programming (LGP). Due to the NP-hardness of the problem, two metaheuristic algorithms named Non-dominated Sorting Genetic Algorithm (NSGA-II) and Multi-Objective Particle Swarm Optimization (MOPSO) are applied to solve various medium and large size problems. The obtained results indicate the high efficiency of the two metaheuristic algorithms in solving the problem and the better performance of the MOPSO algorithm compared with NSGA-II in terms of five indices. Furthermore, the model is implemented in an offshore equipment installation phase of a wellhead platform project. Finally, the sensitivity analysis of the proposed robust model is performed considering different conservation levels, and the results are evaluated by Monte Carlo simulation with three normal, uniform and triangular distributions. The findings demonstrate that the robustness of the model against the variations of uncertain parameters.

Idioma originalInglés
Páginas (desde-hasta)2539-2554
Número de páginas16
PublicaciónKSCE Journal of Civil Engineering
Volumen26
N.º6
DOI
EstadoPublicada - jun. 2022

Huella

Profundice en los temas de investigación de 'A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows'. En conjunto forman una huella única.

Citar esto