TY - JOUR
T1 - A new mathematical model for theworkover rig scheduling problem
AU - Pérez, Miguel
AU - Oliveira, Fabricio
AU - Hamacher, Silvio
N1 - Publisher Copyright:
© 2016 Brazilian Operations Research Society.
PY - 2016/5/1
Y1 - 2016/5/1
N2 - One of the most important activities in the oil and gas industry is the intervention in wells for maintenance services, which is necessary to ensure the constant production of oil. These interventions are carried out by workover rigs. Thus, the Workover Rig Scheduling Problem (WRSP) consists of finding the best schedule to service the wells while considering the limited number of rigs with the objective of minimizing the total production loss. In this study, a 0-1 integer linear programming model capable of efficiently solving the WRSP with a homogeneous fleet of rigs is proposed. Computational experiments were carried out using instances based on real cases in Brazil to compare the results obtained by the proposed model with the results reported by other methods. The proposedmodel was capable of solving all instances considered in a reduced computational time, including the large instances for which only approximate solutions were presently known.
AB - One of the most important activities in the oil and gas industry is the intervention in wells for maintenance services, which is necessary to ensure the constant production of oil. These interventions are carried out by workover rigs. Thus, the Workover Rig Scheduling Problem (WRSP) consists of finding the best schedule to service the wells while considering the limited number of rigs with the objective of minimizing the total production loss. In this study, a 0-1 integer linear programming model capable of efficiently solving the WRSP with a homogeneous fleet of rigs is proposed. Computational experiments were carried out using instances based on real cases in Brazil to compare the results obtained by the proposed model with the results reported by other methods. The proposedmodel was capable of solving all instances considered in a reduced computational time, including the large instances for which only approximate solutions were presently known.
KW - 0-1 Integer Linear Programming
KW - Oil production
KW - Workover rigs
UR - http://www.scopus.com/inward/record.url?scp=84986190032&partnerID=8YFLogxK
U2 - 10.1590/0101-7438.2016.036.02.0241
DO - 10.1590/0101-7438.2016.036.02.0241
M3 - Article
AN - SCOPUS:84986190032
SN - 0101-7438
VL - 36
SP - 241
EP - 257
JO - Pesquisa Operacional
JF - Pesquisa Operacional
IS - 2
ER -