A Heuristic Algorithm for Project Scheduling with Fuzzy Parameters

Mohammad Khalilzadeh, Hedieh Shakeri, Hadis Gholami, Leila Amini

Producción científica: Contribución a una revistaArtículo de la conferenciarevisión exhaustiva

17 Citas (Scopus)

Resumen

The project scheduling is of particular importance among project management issues. With the passage of time and the progress of science and the emergence of concepts such as stochastic and non-stochastic uncertainties and the need to consider these concepts in scheduling and project management, Critical Path Method has also developed as a new method with fuzzy approach, preserving its basic concepts. In this paper, the literature on calculations of project scheduling network with fuzzy approaches is reviewed, subsequently, an algorithm for project scheduling with fuzzy time and resources is developed. This algorithm first calculates the latest start times of activities under fuzzy environment, then, construct a feasible schedule by using the parallel scheduling method. In order to show the effectiveness of the proposed algorithm, a project scheduling problem is solved with certain amount of resources. Finally, an example was solved by the algorithm, considering fuzzy activity durations and resources.

Idioma originalInglés
Páginas (desde-hasta)63-71
Número de páginas9
PublicaciónProcedia Computer Science
Volumen121
DOI
EstadoPublicada - 2017
Publicado de forma externa
EventoInternational Conference on ENTERprise Information Systems, CENTERIS 2017, International Conference on Project MANagement, ProjMAN 2017 and International Conference on Health and Social Care Information Systems and Technologies, HCist 2017 - Barcelona, Espana
Duración: 8 nov. 201710 nov. 2017

Huella

Profundice en los temas de investigación de 'A Heuristic Algorithm for Project Scheduling with Fuzzy Parameters'. En conjunto forman una huella única.

Citar esto