TY - JOUR
T1 - A fuzzy project buffer management algorithm
T2 - a case study in the construction of a renewable project
AU - Zohrehvandi, Shakib
AU - Vanhoucke, Mario
AU - Khalilzadeh, Mohammad
AU - Amiri, Maghsoud
AU - Shadrokh, Shahram
N1 - Publisher Copyright:
© 2022 Informa UK Limited, trading as Taylor & Francis Group.
PY - 2023
Y1 - 2023
N2 - One of the major problems with projects is that they are not completed according to schedule. Uncertainty always exists at the heart of real-world project scheduling problems. This paper introduces a fuzzy project buffer management (FPBM) algorithm which is a combination of the adaptive procedure with resource tightness (APRT) and fuzzy failure mode and effects analysis (FFMEA) methods. This paper aims to present an efficient model for project buffer sizing by taking FFMEA into account to reach a more realistic schedule. In this research, for increasing the efficiency of the APRT method, the FFMEA technique is simultaneously applied with them. This research was carried out as a case study in a renewable energy (RE) project. The methodology of this research consists of two phases. The first phase is the implementation of the APRT buffer sizing method. In the second phase of the research methodology, the fuzzy FMEA method is implemented. To validate the proposed model, the results are compared to several buffer management models proposed recently. Also, the results were compared with the results of similar projects. The findings show that considering the fuzzy FMEA technique in the APRT method, a more realistic schedule was obtained in this project.
AB - One of the major problems with projects is that they are not completed according to schedule. Uncertainty always exists at the heart of real-world project scheduling problems. This paper introduces a fuzzy project buffer management (FPBM) algorithm which is a combination of the adaptive procedure with resource tightness (APRT) and fuzzy failure mode and effects analysis (FFMEA) methods. This paper aims to present an efficient model for project buffer sizing by taking FFMEA into account to reach a more realistic schedule. In this research, for increasing the efficiency of the APRT method, the FFMEA technique is simultaneously applied with them. This research was carried out as a case study in a renewable energy (RE) project. The methodology of this research consists of two phases. The first phase is the implementation of the APRT buffer sizing method. In the second phase of the research methodology, the fuzzy FMEA method is implemented. To validate the proposed model, the results are compared to several buffer management models proposed recently. Also, the results were compared with the results of similar projects. The findings show that considering the fuzzy FMEA technique in the APRT method, a more realistic schedule was obtained in this project.
KW - Critical Chain Project Management method
KW - adaptive procedure with resource tightness
KW - fuzzy failure mode and effects analysis
KW - fuzzy project buffer management
KW - project buffer sizing
KW - project scheduling
KW - renewable energy project
UR - http://www.scopus.com/inward/record.url?scp=85126383155&partnerID=8YFLogxK
U2 - 10.1080/15623599.2022.2045860
DO - 10.1080/15623599.2022.2045860
M3 - Article
AN - SCOPUS:85126383155
SN - 1562-3599
VL - 23
SP - 2134
EP - 2143
JO - International Journal of Construction Management
JF - International Journal of Construction Management
IS - 12
ER -