T1 - Optimización de cuadrillas de trabajo para instalación de obras eléctricas usando programación por metas
AU - Atoche, Wilmer
AU - Farro, Víctor
AU - Román, Yamileth
AU - Barriga, Hernán
N1 - Publisher Copyright:
© 2022 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2022
Y1 - 2022
N2 - This article shows the determination of the optimal number of people that should belong to the work team (crews) for the execution of low or medium voltage electrical works. For this, aspects such as the effective duration of the works, costs of the personnel belonging to the work crew, districts where the electrical works are carried out, and the sequence of activities for each low and medium voltage electrical work were evaluated. In this sense, the model is based on the optimization of the execution time of electrical works carried out (first goal) in different districts, without neglecting the objective of reducing the cost of the composition of the crew (second goal). Finally, the results of the linear programming optimization model by goals conclude that for low and medium voltage underground works, crews of seven people (3 operators and 4 assistants) are required, the same as for medium voltage aerial works; and for low voltage aerial works, five people are required (2 operators and 3 assistants). It should be noted that all these results provide reduced costs.
AB - This article shows the determination of the optimal number of people that should belong to the work team (crews) for the execution of low or medium voltage electrical works. For this, aspects such as the effective duration of the works, costs of the personnel belonging to the work crew, districts where the electrical works are carried out, and the sequence of activities for each low and medium voltage electrical work were evaluated. In this sense, the model is based on the optimization of the execution time of electrical works carried out (first goal) in different districts, without neglecting the objective of reducing the cost of the composition of the crew (second goal). Finally, the results of the linear programming optimization model by goals conclude that for low and medium voltage underground works, crews of seven people (3 operators and 4 assistants) are required, the same as for medium voltage aerial works; and for low voltage aerial works, five people are required (2 operators and 3 assistants). It should be noted that all these results provide reduced costs.
KW - electrical works
KW - multiple objectives
KW - work team
UR - http://www.scopus.com/inward/record.url?scp=85140023077&partnerID=8YFLogxK
U2 - 10.18687/LACCEI2022.1.1.526
DO - 10.18687/LACCEI2022.1.1.526
M3 - Contribución a la conferencia
AN - SCOPUS:85140023077
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - 20th LACCEI International Multi-Conference for Engineering, Education Caribbean Conference for Engineering and Technology
A2 - Larrondo Petrie, Maria M.
A2 - Texier, Jose
A2 - Pena, Andrea
A2 - Viloria, Jose Angel Sanchez
PB - Latin American and Caribbean Consortium of Engineering Institutions
T2 - 20th LACCEI International Multi-Conference for Engineering, Education Caribbean Conference for Engineering and Technology, LACCEI 2022
Y2 - 18 July 2022 through 22 July 2022
ER -