Complex production systems: Non-linear and non-repetitive projects

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

5 Scopus citations

Abstract

In most residential building construction, the production system design relies on the assumption of linearity per zone and per story, thus, takt-time schedules and flow lines are produced accordingly. However, in practice, such smoothness is difficult to achieve due to non-linear and non-repetitive projects. This research aims to identify the main challenges of the production system design when a planning team faces such projects. To achieve this objective, lean scheduling methods are analysed by a complex production system framework including: variety of tasks, task interdependence, supply chain interdependence, and work density. Two simulation case studies are presented. First, the finishing phase of a residential building presents the case of a non-linear project. Second, the structural works of an industrial project presents the challenges of a non-repetitive project. The main finding is that non-repetitive projects can be handled as multiple repetitive non-linear stages. However, the main challenges include the reciprocal interdependence between trade contractors, the work density disparity between locations and trades, the capacity buffer design, and production rates predictions for the assembly of one-off products. This research contributes to the understanding of scheduling in projects where the linearity assumption of activities is violated.

Original languageEnglish
Title of host publicationIGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction
Subtitle of host publicationEvolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers
EditorsVicente A. Gonzalez
PublisherThe International Group for Lean Construction
Pages858-868
Number of pages11
ISBN (Electronic)9789380689296
DOIs
StatePublished - 2018
Event26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers, IGLC 2018 - Chennai, India
Duration: 16 Jul 201822 Jul 2018

Publication series

NameIGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers
Volume2

Conference

Conference26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers, IGLC 2018
Country/TerritoryIndia
CityChennai
Period16/07/1822/07/18

Keywords

  • Complex production system
  • Flow lines
  • Non-linear projects
  • Non-repetitive projects
  • Production System Design