A Step-By-Step Hybrid Approach Based on Multi-Criteria Decision-Making Methods And A Bi-Objective Optimization Model To Project Risk Management

Mohammad Khalilzadeh, Sayyid Ali Banihashemi, Darko Božanić

Research output: Contribution to journalArticlepeer-review

9 Scopus citations

Abstract

Project success and achieving project objectives and goals highly depend on effective and thorough risk management implementation. This study provides a comprehensive and practical methodology for project risk management. In this paper, firstly, the risks were collected by analyzing the historical documents and literature. Then, the collected risks were screened using brainstorming and categorized into five groups. Subsequently, a questionnaire was made and the identified risks were validated using the Fuzzy Delphi technique. Also, the relationships between risks were determined using the Interpretive Structural Modelling (ISM) method. Moreover, the weights of the criteria used to rank the risks were calculated through the Fuzzy Best-Worst Method. Subsequently, the major risks were determined using the fuzzy WASPAS method. Furthermore, a novel bi-objective mathematical programming model was developed and solved using the Augmented Epsilon-Constraint (AEC) method to choose the optimal risk response strategies for each critical risk. The results demonstrated that the proposed framework is effective in dealing with construction project risks.

Original languageEnglish
Pages (from-to)442-472
Number of pages31
JournalDecision Making: Applications in Management and Engineering
Volume7
Issue number1
DOIs
StatePublished - 2024

Keywords

  • Augmented Epsilon-Constraint
  • Bi-objective mathematical model
  • Fuzzy BWM
  • Fuzzy WASPAS
  • Project risk management